WMP Builder

A custom water management program, built for your facility

WMP Builder is designed to help facility water management teams develop a custom, comprehensive Legionella water management program. Enter your facility’s water system assessment information, and WMP Builder produces a complete, survey-ready plan for your building, aligned with ASHRAE 188, the CDC Toolkit, and CMS requirements.

For authorized facilities and staff. Enter your company email to receive a one-time pin.

Example water flow diagram Water enters from the municipal supply, is distributed cold to fixtures, heated and stored, tempered by a mixing valve, delivered hot to fixtures, and drained to the sanitary sewer. Receiving Cold Heating Hot Waste Municipal water supply4-inch main Eye washstations Kitchen &laundry Sinkshand · clinical Showers& tubs Water heaters2 joined · 140°F Domestic loop114–120°F delivered Service loopkitchen · laundry Sanitary sewer
Every plan includes flow, hazardous-conditions, and monitoring diagrams drawn from that building’s own answers.

What’s in each plan

Thirteen sections and a complete forms library, tailored to each facility. Equipment the building doesn’t have is left out; everything it does have gets its own control points, limits, and monitoring.

  1. 1
    Program policyDefinitions and the fifteen compliance commitments.
  2. 2
    Team & responsibilitiesRoster with phone numbers, task matrix, and the flow diagram.
  3. 3
    Risk assessmentCDC at-risk survey and a control-point risk register.
  4. 4
    Operations & maintenanceControl limits, monitoring points, dead legs, and schedules.
  5. 5
    Control measures & testingCorrective actions, reoccupancy, and the Level 1–3 response.
  6. 6
    Clinical surveillanceCase recognition, testing, reporting, and investigation.
  7. 7
    SamplingTraining guide and the quarterly Legionella sampling plan.
  8. 8
    Team trainingControl limits to know, the response ladder, and competency questions.
  9. 9
    Monthly water assessmentsWater-quality summary from the supplier’s report and Form 9-1.
  10. 10
    Events & corrective actionsEvent records, corrective-action log, and the flushing log.
  11. 11
    Legionella resultsArchive and interpretation guide for lab reports.
  12. 12–13
    Forms & annual reviewBlank masters of every form, review triggers, and revision record.

How it works

Each plan is generated from the facility’s water system assessment information.

  1. Answer for one building

    Water supply, cold and hot water, heaters and mixing valves, testing, team, and the at-risk survey. Upload the supplier’s water quality report to fill in Section 9.

  2. Check what’s missing

    Required answers are flagged before anything is built. Monitoring-point coverage, dead legs, and blank items are listed so nothing is left to chance.

  3. Generate the plan

    Download the finished plan as a PDF, with a linked table of contents, or as an editable Word document. Rebuild it at each annual review.

Written to the standards healthcare surveyors check

Each plan follows ANSI/ASHRAE Standard 188, the CDC Legionella Water Management Program Toolkit, and CMS QSO-17-30, with AIHA action levels for test results.

  • No invented numbers: lab results, water-quality values, and logs come only from the facility, and report values print only after someone confirms them.
  • State rules are applied by date.
  • Blank answers print as clearly marked lines to complete, never as guesses.
  • Every plan is dated, numbered, and carries a revision record for the annual review.

Sign in

WMP Builder is available to authorized healthcare facilities. Enter your company email to receive a one-time pin; there’s no password to remember. If your email isn’t accepted, contact support to request access.

Sign in to WMP Builder

Support

Questions about signing in, access for a new facility, or a plan that doesn’t look right? Email the WMP Builder support team. Include the facility name and what you were doing when the problem happened.